Thundridge Bore Hole PS

About

JB Fabrication were awarded this contract as we have carried out many installations for the QS on other sites whilst he was working on the DCWW framework for one of the partners.

Project Overview

After a site survey to ensure the drawings tender drawings were accurate it was found that there were considerable discrepancies’ that affected the installation process, working closely with the client we overcame these challenges and agreed an alternative design for the pipework layout.

The installations were carried out during pre-arranged shutdowns, enabling the client to maintain the supply. All the work was completed on time as per programme.

The pumps were commissioned and back in service prior to the next arranged shutdown allowing for a run into service period.

The pipework was all manufactured to the highest standards by our coded welders and coated to DWI approved Resicoat R4.